On June 27, a small crowd gathered under a stand of redwoods and oaks behind the Atherton Library to cut a ribbon on a brand-new 6,200-square-foot Children's Garden. A mile or so away at Holbrook-Palmer Park, the town's one public playground for kids ages five to twelve has been fenced off since May 4, mid-renovation, with no posted date to reopen. Same town, same summer, two civic projects meant to do roughly the same job, and two completely different clocks. That gap is worth sitting with, because it explains something about how Atherton actually funds and runs its shared spaces that no ribbon-cutting photo will tell you.
A Town Built Around One Park
Atherton doesn't have a downtown in the way Menlo Park or Palo Alto do. No commercial strip, no cluster of restaurants residents default to on a Friday night. What it has instead is Holbrook-Palmer Park, a 22-acre garden property left to the town in 1958 and described on the town's own site as Atherton's only recreation site. Tennis courts, the Willie Mays Ball Park, an event garden, walking paths, and the playground that's currently closed all sit inside that single footprint. When something changes there, or at the library about a mile off, it changes the public experience for the whole town at once, not just one neighborhood's slice of it.
That concentration is exactly why this summer's timing gap stands out. In a town with a dozen parks, one playground closing for a few months barely registers. In a town with one park, it's the whole story for anyone with young kids until it reopens.
Two Projects, Two Very Different Bank Accounts
The simplest explanation for why the garden opened before the playground reopened isn't about priorities. It's about which pot of money legally can pay for what.
Atherton's library operates on a dedicated tax that can only be spent on library-related projects. Vice Mayor Rick DeGolia, who chairs the San Mateo County Libraries Joint Powers Authority board, explained the mechanism plainly to the Friends of the Atherton Library:
"Our library is paid for with a special library tax. Those funds go into a dedicated account, and to the extent that there are more taxes from our jurisdiction, Atherton, than there are costs to manage our library, the excess goes into the fund and can be used for any Atherton Library purposes."
Once the town paid off its main library renovation in full, that dedicated account kept collecting revenue with nowhere earmarked to send it. The Children's Garden became the approved use of that surplus. Meanwhile, the older-kids' playground competes for funding against every other line item in the town's general parks budget. At the February 2024 council meeting where the garden concept was first reviewed, at least one resident asked out loud whether the town should be building a new nature space at all while it was still figuring out how to fix the playground. The answer, in practice, was that the two projects were never actually competing for the same dollars. They just happened to land in the same calendar year.
The Slow Build Nobody Outside Town Hall Tracked
The garden's own timeline is its own lesson in how long small civic builds actually take once you follow the paper trail:
- February 2024 — Public Works Director Robert Ovadia presents the concept to council, with a project estimate of $475,000 and hopes to break ground that July.
- September 2025 — the council rejects all submitted bids because every one came in over budget.
- November 2025 — council approves a $617,000 construction contract with Selway Construction of San Jose, the lowest responsive bidder.
- June 27, 2026 — the garden opens, with the total project cost landing near $682,000, covered by the library's Joint Powers Authority fund plus a $10,000 donation from the Friends of the Atherton Library.
That's a roughly 44 percent gap between the original 2024 estimate and the final number a little over two years later, for a project with no swings, no slides, and no monkey bars. It's the kind of overrun anyone who has managed a home renovation on the Peninsula will recognize immediately: material and labor costs move faster than public budgeting cycles, and a project that looks straightforward on a rendering rarely stays inside its first estimate.
What Actually Opened on June 27
What residents got for that money is a genuinely different kind of play space than the fenced playground down the road. Set beneath the redwood and oak grove on the library's west side, the garden includes a willow hut, an accessible tree house, a winding branch tunnel, a climbing boulder, log benches, and stump-walk features built from reclaimed oak gathered around town. There are no swings and no monkey bars by design. Ovadia described the concept to the Friends of the Atherton Library as a nature space meant to encourage exploration rather than a conventional playground.
The project also carries a bit of continuity. San Mateo County Libraries says the new garden was inspired by the children's garden that once stood behind Atherton's previous library. Mayor Stacy Holland and Vice Mayor DeGolia both spoke at the ribbon-cutting. DeGolia's remarks tied the space back to the library's basic mission:
"Libraries have always stood for the belief that access to knowledge, resources and opportunity should be available to everyone, and that principle doesn't stop at the library doors."
Meanwhile, Down at the Park
Holbrook-Palmer isn't sitting quiet while its playground gets rebuilt. The park's lawns and pavilion have carried this summer's full public calendar on their own. Movies in the Park opened the season on June 4 with a screening in the North Meadow, free popcorn included. The Sounds of Summer concert series has followed on the same lawn, two shows down and one still ahead:
- June 18 — Take 2 Dance Band (already played)
- July 16 — Maya Band, playing the songs of Selena (already played)
- August 20 — Soul Practitioners, making their Sounds of Summer debut (still to come)
National Night Out filled the park again on August 4. All of it has happened with the fenced-off playground sitting a short walk from the bandstand, proof that a 22-acre property can absorb a concert series and a construction zone at the same time without either one crowding the other out.
What This Means If You Live Here
The honest read on this summer isn't that Atherton finally got its civic act together. It's that two disconnected funding processes, running on their own separate timelines for two or three years apiece, both happened to cross the finish line in the same season. The library tax filled up and had one legal outlet. The playground project has moved on its own town budgeting track, one that answers to a different set of priorities than a restricted library fund ever has to.
For a resident walking the park this month, the practical upshot is simple: there's genuinely more usable public space in Atherton right now than there's been in a few years, split between two sites a short drive apart. For anyone curious about how the next project gets funded and when it lands, the answer has less to do with the town's priorities and more to do with which account happens to have room in it. That's a small-town budgeting quirk, but it's the kind of detail that tells you more about how Atherton actually operates than a ribbon-cutting photo ever will.
If the same close attention to detail and timelines is something you'd want when preparing your own Atherton property for the market, Tom Correia has spent decades tracking exactly this kind of local detail. Request a free home valuation whenever you're ready to talk.